This screen can be used to maintain the set of per diem M&IE (Meals and Incidental Expenses) breakdowns that will be available in your system.
Each Unanet installation will be capable of affecting M&IE reimbursement amounts via configurable per diem policy values. The actual policy values will control the meal breakdown amounts and partial day proration factors for M&IE reimbursement calculations (performed in the M&IE wizard).
The calculation of M&IE Per Diem reimbursement requires that all meals provided be deducted from the daily per diem allowance. The actual per meal deduction can vary by the M&IE allowance.
Two methods are available for establishing M&IE breakdown amounts.
The first is a M&IE breakdown schedule that can be used to identify specific meal amounts relative to M&IE allowance amounts. This screen can be used to enter specific values. You can also use the Admin >> Import >> M&IE Breakdown to load your schedule. A sample file is available for download from our support site.
The second is a set of M&IE breakdown percentages that will generally define the component breakdown percentages for all M&IE allowance amounts that are not specified in the M&IE breakdown schedule (specified by unanet.property values).
This screen is available to users having the Administrator and P&R Administrator role.
This screen is available with the Project Expense, Project Tracking and Project Portfolio family of Unanet licenses.
Topics covered on this help page include:
|
|
When adding a new entry, the value entered for M&IE Rate must equal the sum of the Breakfast, Lunch, Dinner and Incidental values.
A default set of percentages will be used to determine the breakdown values for all M&IE rates that are not found in the M&IE breakdown schedule. These percentages will be defined using three new modifiable Unanet properties:
Item |
Property |
Default Value |
Breakfast Percent |
MIE Breakdown Breakfast Percent (unasense.per_diem.mie.breakdown.breakfast.percent) |
15 |
Lunch Percent |
MIE Breakdown Lunch Percent (unasense.per_diem.mie.breakdown.lunch.percent) |
25 |
Dinner Percent |
MIE Breakdown Dinner Percent (unasense.per_diem.mie.breakdown.dinner.percent) |
40 |
The property values will be specified in percentage format; i.e., 15 for 15% and 15.5 for 15.5%.
In M&IE per diem calculations, the first and last day of a trip are typically considered partial days. Partial days will have their per diem allowance adjusted based on a pair of configurable proration factors. The proration factors will be specified as percentages and will be defined using two new modifiable Unanet properties:
Item |
Property |
Default Value |
First Day Proration Factor |
MIE First Day Proration Percent (unasense.per_diem.mie.first_day.proration.percent) |
75 |
Last Day Proration Factor |
MIE Last Day Proration Percent (unasense.per_diem.mie.last_day.proration.percent) |
75 |
The property values will be specified in percentage format; i.e., 75 for 75% and 100 for 100%.
If your company policy does not recognize this concept, you may want to set these values to 100.